Formosa 2 Wind Power
Connect and collaborate with SEMI's global network of ~3000 member companies.
Formosa 2 Wind Power
Member Since
Jul 8, 2025
Member ID
1203683
Website
Location
13 F.-5, No. 282, Shizheng N. 2nd Rd.,
Xitun District
Taichung City
407608
Taiwan
Primary Industry
Semiconductor
Primary Product Category
Services
Company Profile
Formosa 2 is jointly developed by Stonepeak (51%) and JeraNex (Jera Group) (49%), with a total installed capacity of 376 MW. All 47 wind turbines were installed by January 2023 and achieved full grid connection in March the same year. The project reached its Commercial Operation Date (COD) on September 8, 2023, officially entering the operations and maintenance (O&M) phase. Formosa 2 is expected to supply clean electricity to approximately 380,000 households annually.
Formosa 2 is deeply committed to advancing localization within Taiwan’s offshore wind industry. During the construction phase, we collaborated closely with several local consultancies—including Unitech, CECI, and Sinotech—to manage permitting processes and the design of onshore electrical systems.
Now in the O&M phase, we continue to work with local partners such as CECI and Sinotech to support ongoing operations. This long-term engagement demonstrates our strong local execution capabilities and our dedication to becoming a leading force in Taiwan’s offshore wind sector.
Formosa 2 is also committed to cultivating talent for the offshore wind industry. From 2018 to 2024, we have partnered with National United University to establish the "Formosa 2 Offshore Wind Expertise Program”, offering scholarships to su(more...)