downloadGroupGroupnoun_press release_995423_000000 copyGroupnoun_Feed_96767_000000Group 19noun_pictures_1817522_000000Member company iconResource item iconStore item iconGroup 19Group 19noun_Photo_2085192_000000 Copynoun_presentation_2096081_000000Group 19Group Copy 7noun_webinar_692730_000000Path
Skip to main content
Dr. Peter LENDERMANN, Chief Business Development Officer, D-SIMLAB Technologies

Peter Lendermann is a Co-Founder and the Chief Business Development Officer of D-SIMLAB Technologies, a Singapore-based company providing simulation-based decision support solutions to Semiconductor Manufacturing companies and other asset-intensive industries.

Prior to this, he worked at the Singapore Institute of Manufacturing Technology where he led related R&D activities until spinning them off into D-SIMLAB. Peter has been engaged in the field of production logistic, supply chain management and related decision support technologies and solutions since the early 1990’s.

He holds a PhD in Physics from Humboldt University in Berlin (Germany) and an MBA in International Economics and Management from SDA Bocconi in Milan (Italy).

Presentation Title:
Enhanced Predictions, Smarter Actions: A Few Lessons from Front End Production Planning

In the setting of the three-pillar smart manufacturing framework of ‘Connect, Sense and Predict’ as advocated by SEMI it turns out that a fourth pillar ‘Act’ should possibly deserve prominent consideration as well: Because whatever has been predicted, most value-add can be realised once some decisions with regard to how to ‘Act’ can be derived from such a prediction. In a semiconductor frontend facility in particular, the ability to pro-actively adjust action plans in a timely manner, based on high quality predictions and forecasts, is essential to overcoming challenges arising from changing customer due dates, mix profile changes, untimely production line issues, and production capacity to be shared with R&D lots effectively, so that ultimately capacity can be enhanced, cycle times be reduced and due-date performance can be improved. The presentation will describe some of the lessons arising from the specific characteristics of the production environment of a semiconductor frontend facility and some of the challenges to be addressed to make such facilities operate in an even more agile and cost effective manner.

Back to Agenda